Industrial Ecology: Some Directions for Research

IK Wernick, JH Ausubel. With the Vishnu Group, The Rockefeller University and Lawrence Livermore National Laboratory 1997

…homepage: https://www.elsevier.com/locate/estoc Scrap Recycling and Processing, Institute of Scrap Recycling Industries, A bi-monthly trade journal for the scrap reprocessing industry. Homepage: https://www.isri.org/pubcat00.htm#scrapmag Selected Data Sources (General and Specific) General Organization for…

Toward Green Mobility: The Evolution of Transport

JH Ausubel, C Marchetti, PS Meyer. European Review 6 (2): 143–162 1998

Online at URL https://www.bts.gov/ntl/. 34US Department of Transportation (1997) National Transportation Statistics 1997 (Washington, DC: Bureau of Transportation Statistics). Online at https://www.bts.gov/btsprod/nts/. 35J. H. Ausubel and C. Marchetti (1996) ‘Elektron’, Daedalus 125, 139-169. 36M. Jufer…

Five Worthy Ways to Spend Large Amounts of Money for Research on Environment and Resources

JH Ausubel. The Bridge 29 (3): 4–16 1999

…ETH-Lausanne, Switzerland, 30 August 1996. URL https://sentenext1.epfl.ch/swissmetro. [18] U.S. Department of Transportation, Compendium of Executive Summaries from the Maglev System Concept Definition Final Reports, DOT/FRA/NMI-93/02, pp. 49-81, March 1993. On-line at https://www.bts.gov/smart/cat/CES.html…

Mitigation and Adaptation for Climate Change: Answers and Questions

JH Ausubel. The Bridge 23 (3): 15–30 1993 Also pp. 557-584 in Costs, Impacts, and Benefits of CO2 Mitigation, Y. Kaya, N. Nakicenovic, W.D. Nordhaus, and F.L. Toth, eds., International Institute for Applied Systems Analysis, Laxenburg, Austria, 1993.

…a cost-benefit analysis, the conclusion might be that no social response is warranted, if avoiding the problem costs 2 percent and incurring the problem costs only 1 percent. Costs could…

Verification of International Environmental Agreements

JH Ausubel, DG Victor. Annual Review of Energy and the Environment 17: 1–43 1992

…in the Whaling Convention. Thus, the 18-year delay does not disprove the hypothesis here, though it does weaken it. 8 Additional difficulties in negotiating intrusive arms control verification procedures stem from…

The Census of Marine Life: Progress and Prospects

JH Ausubel. Fisheries 26 (7): 33–36 2001

…sources, public and private.  The main cost of the program will be the field projects, likely to cost about $5-$25 million each.  While Sloan and other private funders can catalyze…

Elektron: Electrical Systems in Retrospect and Prospect

JH Ausubel, C Marchetti. Technological Trajectories and the Human Environment 110–134 1997 Also appeared in Daedalus 125(3):139-169, Summer 1996.

…variable cost combine with base-loads plants with high capital cost and low variable cost to determine the current usage level. Although the utilization factor surely has a logical upper limit…

Some Ways to Lessen Worries about Climate Change [PDF]

JH Ausubel. The Electricity Journal 14 (1): 24–33 2001

…services will profit. However, entering the marketing too early can cost as much as entering too late. Society does not want to risk being too late. Thus, cooperative efforts boosted…